Director:
Umut
Crew:
Umut,
Monisha Prescott-Banton and Aaliyah Brown-Peters
Pre-production
Activity
|
Details
of Activities
|
Date
|
The pitch
|
We are going to devise a PowerPoint on the
final idea of our film including the plot, conventions of our genre, similar
films, narrative structure, poster ideas and target audience
|
10.9.14
|
Proposal
|
Aaliyah is going to briefly explain the
narrative of the film in a synopsis and description of content as well as
outline the purpose of our film and a descriptive idea of our target audience
|
17.9.14
|
Treatment
|
Umut is going to outline the narrative of
our film in detail including aspects structure, mise-en scene, sound,
cinematography and editing
|
17.9.14
|
Audience profile
|
Monisha is going to outline an account of
our target audience (primary and secondary) including an example of both male
and female individuals who would watch our type of film.
|
24.9.14
|
Textual analysis
|
We are individually going to create a
detailed analysis of a film of the same genre as the film we intend to create
describing elements to do with narrative and codes and conventions of the
genre
|
24.9.14
|
Screenplay
|
Monisha is going to create a script of
dialogue detailing what the actors in the film are going to say
|
24.9.14
|
Shot list
|
We as a collective group are going to plan
each shot of our film including angles and movement to enable us to have a
clear idea of each scene which will make it easier for when we start filming
|
24.9.14
|
Reece Report
|
Aaliyah is going to take pictures of the
settings/locations we intend to use and explain why we chose the location,
problems we are likely to experience and how we plan to overcome these
problems
|
1.10.14
|
Production:
Filming
Days
|
Date
|
Filming for rough cut 1 will commence on
the 6.10.14 – 17.10.14 (6th October to 17th October)
|
|
Hit and run scene
|
7.10.14 Tuesday after college
|
House scene
|
9.10.14 Thursday after college
|
House scene
|
11.11.14 Saturday
|
Re- film house scene
|
12.11.14 Sunday
|
Post-Production:
Editing
|
Date
|
Rough
cut 1
|
20.10.14
– 24.10.14 (20th October to 24th October
|
Round
cut 2
|
3.11.14
– 16.11.14 (3rd November to 16th November)
|
Final
Cut Deadline:
|
24.11.14
– 5.12.14 (24th November to 5th December)
|
No comments:
Post a Comment